Development Opportunity

Craobh Haven, Lochgilphead, Argyll and Bute, PA31 8UU

Guide Price

£350,000

SOLD

UNDER OFFER

Marketed by

Bidwells, Scotland
Broxden House,
Lamberkine Drive,
Perth,
PH1 1RA
  • Floorplan
  • View Brochure
  • Print Details
  • Add To Shortlist
  • Send To Friend

Full planning permission for two high-specification, unique and substantial properties, one of which has been partially completed, in a highly sought-after west coast location.

Lot 1 – Lunga Mill – Offers Over £350,000

DESCRIPTION

Lunga Mill
The former mill was built c.1700 and served the old castle at Lunga (now Lunga House) operating as a grain mill, sawmill and was one of the first on the west coast to produce electricity. The original wheel was replaced with a “poncelet” undershot wheel around 1850 which has now been reset on its axis and one day might provide power for the mill once more.

The site extends to approximately 0.8 acres (0.32 hectares) and comprises a former mill with planning permission for alterations, extension and change of use to form a high-specification, substantial and somewhat unique property together with a detached garage. Please refer to the Argyll and Bute Planning Council's Portal (reference 22/01102/PP) for further information and in relation to all consents.

Work on the mill has already commenced and has been partially completed. The existing stonework has been entirely rebuilt were required and repointed with lime mortar, while approximately 10 years ago the roof was reconstructed and finished with recycled Ballachulish Slate. The oak frame was built around the same time using Scottish oak provided by Forestry Land Scotland from sustainable sources. Much of the refurbishment has been carried out using repurposed materials such as floor beams from the Old Leith Academy in Edinburgh and a former church in Lochgilphead.

The external composition is made up of the original stonework, with sections of timber cladding and a natural slate-covered roof and decked areas. Once finished, assuming one keeps to the existing design, the ground floor will comprise a kitchen, larder, utility, a spacious open plan dining area/living room, conservatory, study, shower room, double bedroom and ensuite. The first floor will provide three double bedrooms with ensuites, as well as a mezzanine with a terrace. Large windows on the western elevation and skylights on the pitched roof will bathe the spacious interior with natural light.

Externally, the property provides an existing garage/workshop clad with waney edged board and could be used as storage space or a variety of other uses. There is also provision within the approved plans for a new double garage and car-port offering ample secure parking. The site includes amenity areas which may benefit from some additional landscaping, depending on what a potential purchaser aspires to achieve. To the rear of the property, adjacent to the waterfall has been excavated and reformed with rocks and boulders providing an engineered stable foundation.

Currently, the Mill is served by a private water supply originating elsewhere on Lunga Estate, while the planning permission allows for upgrade/enhancement of the existing septic tank system. Electricity is already connected.

Please contact our agency team for more information.

VIEWING

Strictly by prior agreement with the selling agents who should be contacted in advance to advise on access arrangements.

AML

Any offer by prospective purchaser(s), regardless of where they are ordinarily resident and regardless whether on a cash or subject to loan finance basis, must be accompanied by a financial reference from a bank/funding source that is acceptable to the sellers. Prospective purchasers will also be required to produce identification sufficient to satisfy anti money laundering regulations and checks against the intended purchaser or nominee together with other documentation that may be required, from time to time, in order to support any conditional offers submitted to the seller. Bidwells LLP accepts no liability of any type arising from your delay or other lack of co-operation in this regard. Failure to provide the requisite AML documentation with offers may result in them not being considered at the closing date or being superseded by an offer which is. Settlement may also be delayed or aborted due to non-compliance with requests for information or failure to deliver adequate information within the requisite timeframes. We may hold your name on our database unless you instruct us otherwise.